|
|
Caldwell Schools
Lighting Summary:
- Square Feet: 729,345
- # of Schools: 6
- Total Construction Costs: $1,200,021
- Total Fixtures: 22,263
- Total Construction Time: 4 months
Mechanical Summary:
- # of Schools: 4
- System Conversion: Steam to Hot Water
General Construction:
- 65,000 Square Feet of Drop Ceiling Installed
- DDC Controls; Building Automation System Installed
Link to Caldwell/West Caldwell
Schools: http://www.cwcboe.org/
|